国产黄A三级三级三级老师,国产激情久久久久成熟影院,试看国语对白精品免费毛片,朋友的朋友4线观高清中文,99re在线视频亚洲精品,
Hello, welcome to Jinan Huawei CNC machinery CO., Ltd

Advanced Search:


Contact us


contact us

Contacts:JI Manager

Unified hotline:400-6587-688

Tel: (86)531-88276988

Fax:(86)531-88276988

Phone number:0086-15269186223

Address: No.18 Tonghua Road ,

Licheng district , Jinan city, 
shandong province, China



Industry news

Installation process of automobile mold machine

Source: Time:2024-02-03 09:24:42 views:

The installation process of automobile mold machine mainly includes the following steps: 1. Preparation work: Clean up the installation site, check the integrity of the equipment, and ensure that the equipment meets the safety requirements

The installation process of automobile mold machine mainly includes the following steps:

1. Preparation work: Clean up the installation site, check the integrity of the equipment, and ensure that the equipment meets the installation requirements.

2. Equipment handling: The handling equipment used transports the equipment from the factory to the installation site.

3. Equipment installation: Install the equipment according to the equipment installation drawings, including steps such as positioning, fixing, and connecting the equipment.

4. Equipment debugging: Debug the equipment to ensure that it can operate normally.

5. Equipment acceptance: The equipment supplier and user jointly conduct equipment acceptance to confirm that the equipment meets installation requirements and can operate normally.

6. Training: Provide training to users on equipment operation and maintenance to ensure that they can use and maintain the equipment correctly.

The above are the main steps of the installation process for automotive mold machines, and each step needs to be strictly carried out according to the requirements to ensure that the equipment can operate normally.

keys: 
国产黄A三级三级三级老师,国产激情久久久久成熟影院,试看国语对白精品免费毛片,朋友的朋友4线观高清中文,99re在线视频亚洲精品,